Peak Water, Not Average Water.
A reproducible public-evidence capacity screen for data-center growth in Loudoun County, Northern Virginia.
Abstract. This release tests how published utility and regional water evidence can be translated into a transparent compute-capacity screen without treating annual averages, nominal future system capacity, reclaimed supply and hydrologic consumption as interchangeable quantities. The contribution is a peak-water screening method and evidence workflow—not a utility will-serve determination or a final Critical Load rating.
The infrastructure signal becomes materially stronger at the peak.
The ratios below are Critical Load calculations using Loudoun Water's published baseline values. They should be read as ratios of published values, not as proof that each system and data-center maximum occurred at the same instant.
The data-center peak/average ratio is about 1.8 times the system-wide peak/average ratio using the published baseline figures.
An annual-average water metric can materially understate the service-capacity question relevant to large additions of compute.
Convert an explicit peak-water budget into compute without hiding the allocation assumption.
The PWCS starts from a declared maximum-day potable allocation. It deliberately does not call nominal future utility capacity “available headroom.”
Pscreen = max(0, B / Ipeak)
Illustrative v1.0 values: Cfuture = 90 MGD; a = 16%; current published data-center peak potable demand = 8 MGD. The 16% allocation is an E4 analyst scenario, not utility policy.
Reclaimed supply can reduce potable burden without removing total consumption.
The method keeps water source and hydrologic consumption separate. This prevents reclaimed water from being treated as “zero water.”
Estimated consumption = Dtotal × c
v1.0 uses the ICPRB 75% consumptive factor only as a transparent regional-analysis sensitivity. Project cooling cycles, blowdown, discharge and seasonality should replace it when available.
| Reclaimed share | Potable peak / +1 GW medium case | Reclaimed peak | Consumption sensitivity |
|---|---|---|---|
| 0% | 2.90 MGD | 0.00 MGD | 2.175 MGD |
| 50% | 1.45 MGD | 1.45 MGD | 2.175 MGD |
| 100% | 0.00 MGD | 2.90 MGD | 2.175 MGD |
The output is a screen and an evidence-request workflow.
Site screening; infrastructure diligence; cooling/source comparison; scenario comparison; utility data requests; framing project-specific evidence gaps.
Utility will-serve; hydraulic design; permit approval; drought allocation; water-right determination; final Critical Load rating.
Compute basis
Declare IT MW and project phasing.
Water boundary
Potable, reclaimed, watershed and discharge.
Peak evidence
Average plus maximum-day demand.
Cooling cases
Project WUP or explicit scenario bounds.
Escalate
Hydraulics, hydrology, drought and review before rating.
Paper → source register → inputs → code → model → scenario outputs.
The release package is designed so the headline arithmetic can be recomputed without trusting the website.
The next improvement is external evidence, not more decorative modelling.
v1.0 intentionally stops before a final water-constrained compute envelope. The unresolved gates are substantive: utility service/hydraulic evidence, project-specific seasonal WUP, low-flow and drought conditions, wastewater/blowdown treatment, project phasing and independent domain review.
Cite the release at the strength it actually supports.
Critical Load Research Group (2026). Peak Water, Not Average Water: A reproducible public-evidence capacity screen for data-center growth in Loudoun County, Northern Virginia. CL-WP-004 / R04 / CL-P03 / CL-001. Working Paper v1.0, 19 September 2026. DOI pending.
Primary and official evidence remains identifiable.
The web summary does not replace the source register. Core inputs are linked below, while the downloadable CSV records evidence class, use, access path and limitations.
| Source | Role in v1.0 | Open |
|---|---|---|
| Loudoun Water · Data Center Water Use | Published average-day, maximum-day and future permitted-capacity baseline | Source ↗ |
| Loudoun Water · Reclaimed Water Program | Local reclaimed-water context and service framing | Source ↗ |
| ICPRB · 2025 WMA Water Supply Study | Regional direct-water scenarios and planning context | Study ↗ |
| ICPRB · Data Centers and Water Use | Peak, seasonality and consumptive-use context | Source ↗ |
| R04 source register | Machine-readable evidence trail and evidence classes | CSV → |